| 1 | Confirm the application and welding process | Identify the battery cell or component type, material, joint design, weld location, production rate, and required inspection method. Ask for sample welds using representative parts. | Weld quality depends on the material, joint geometry, surface condition, laser settings, fixturing, and process control. A machine specification alone cannot confirm suitability for every battery assembly. | Send drawings, material details, and representative samples for a documented application test before placing an order. |
| 2 | Check export packing and shipping terms | Request packed dimensions and gross weight, lifting points, crate details, transport mode, insurance terms, and a clear allocation of export and import responsibilities. | Confirm the agreed Incoterms® 2020 rule and named place. If solid-wood packaging is used for international shipment, verify compliance with applicable ISPM 15 requirements. | Have your freight forwarder review the packing list, commercial invoice, shipping route, and handling requirements before dispatch. |
| 3 | Prepare customs and import documentation | Confirm the product description, country of origin, declared value, serial-number records, and any certificates or permits required by the destination market. | Tariff classification, duties, taxes, and import controls depend on the destination country and the equipment configuration. Do not assume one classification or duty rate applies globally. | Ask a local customs broker to verify the HS classification and documentation requirements before shipment. |
| 4 | Match site utilities and facility conditions | Obtain the machine’s electrical input requirements, phase and frequency, rated power, grounding requirements, cooling method, compressed-air needs, and environmental limits. | Local voltage, frequency, plugs, electrical codes, and utility capacity vary by market and facility. Cooling, ventilation, and extraction requirements depend on the machine design and process. | Have a qualified local electrician and facilities team review the supplier’s installation drawings and utility checklist in advance. |
| 5 | Plan installation, access, and laser safety | Check floor capacity, doorway and aisle clearance, unloading equipment, service access, machine layout, guarding, interlocks, and required operator training. | Determine the laser classification of the complete delivered system and follow applicable local laser-safety rules. Risk controls may include an enclosure, interlocks, controlled access, and suitable procedures. | Complete a site-readiness review before shipment and appoint trained personnel to coordinate installation and safety validation. |
| 6 | Define commissioning and acceptance criteria | Agree on installation scope, commissioning steps, operator training, process validation, documentation, and the method for evaluating sample welds. | Acceptance criteria should be measurable and based on the intended application, approved samples, inspection method, and agreed production conditions. | Record the acceptance test procedure and required deliverables in the purchase agreement before production and shipment. |
| 7 | Verify warranty, spare parts, and global support | Clarify warranty start date and exclusions, remote diagnostics, service languages, support hours, escalation contacts, spare-parts availability, and technician travel arrangements. | Response times, repair timelines, and parts availability are service commitments, not universal standards. They should be stated for the buyer’s location and operating conditions. | Request written service-level terms, a recommended spare-parts list, troubleshooting instructions, and a named support contact for the destination region. |