| Residential service-entrance ATS | Commonly 100–200 A; 120/240 V, single-phase | Single-phase; typically 2 poles, with neutral treatment determined by the system design | Usually open transition: the utility is disconnected before generator power is connected | Whole-home backup where the switch also serves as the service disconnect | Verify service-entrance listing, available fault-current rating, generator capacity, and whether neutral switching is required. |
| Residential non-service-entrance ATS | Commonly 100–200 A; 120/240 V, single-phase | Single-phase; often 2 poles; neutral configuration depends on the installation | Typically open transition, with automatic sensing and generator start controls | Whole-home or subpanel backup when a separate service disconnect is already installed | Check that the ATS is rated for its position in the electrical system and that the selected loads do not exceed generator capacity. |
| Critical-load subpanel ATS | Commonly 30–100 A; 120/240 V, single-phase | Single-phase; commonly 2 poles | Usually open transition; only the circuits wired to the backed-up panel transfer | Homes or small facilities prioritizing essential circuits such as refrigeration, lighting, and communications | Size for the subpanel load and generator output; confirm which circuits require backup and how they are protected. |
| Commercial low-voltage three-phase ATS | Commonly 100–1,200 A; systems up to 600 V AC, including common 208 V and 480 V systems | Three-phase; 3-pole or 4-pole options are available | Most commonly open transition; control options can include adjustable transfer delays | Commercial buildings, pumps, retail sites, and facilities with three-phase loads | Match phase, voltage, frequency, pole count, short-circuit withstand/closing rating, and load type. |
| Closed-transition ATS | Low-voltage units are commonly available in ratings from roughly 100 A upward; voltage and maximum current depend on the design | Single- or three-phase configurations are available | Briefly overlaps sources while synchronism conditions are met, helping avoid an interruption during transfer | Sites with sensitive processes or loads where a momentary break in power is undesirable | Requires compatible, synchronized sources and utility approval where applicable; confirm the permitted overlap time and control scheme. |
| Bypass-isolation ATS | Commonly offered in low-voltage ratings from about 100 A to several thousand amperes; exact limits vary widely | Often three-phase; pole options depend on the system | Automatic transfer with a separate bypass path that can maintain load power while the ATS is isolated for service | Hospitals, data centers, and other facilities where maintenance access and continuity are important | Review bypass operation, isolation procedure, maintenance requirements, and the equipment’s fault-current rating. |
| Medium-voltage ATS | Commonly built for medium-voltage systems in the 2.4–15 kV class; current ratings are design-specific and often hundreds of amperes or more | Typically three-phase; switching and grounding arrangements depend on the system | Automatic source transfer using medium-voltage switching equipment and dedicated controls | Large campuses, industrial facilities, and sites supplied at medium voltage | Requires engineering review of system voltage, protection coordination, grounding, switching duty, and utility requirements. |