| Lightning impulse insulation test | 1.2/50 μs Standard switching and lightning impulse voltage waveform | High-voltage impulse | Insulation coordination and dielectric withstand testing of electrical equipment, insulation systems, bushings, transformers, cables and other high-voltage components | Front time: approximately 1.2 μs Time to half-value: approximately 50 μs Polarity: positive, negative or both, depending on the test plan | Select a voltage impulse generator with sufficient peak voltage, charging voltage, energy and test-object capacitance range. The output circuit should support waveform adjustment and low-inductance connections. | Use a calibrated high-voltage divider and impulse recorder. Provide controlled earthing, adequate clearance, interlocks, discharge equipment and a defined approach boundary. |
| Surge protective device current test | 8/20 μs Standard current impulse waveform | High-current impulse | Surge protective devices, varistors, gas discharge devices, semiconductor protection components, bonding conductors and lightning-current protection paths | Front time: approximately 8 μs Time to half-value: approximately 20 μs Peak current and transferred charge depend on the selected test level | Select a current impulse generator based on peak current, open-circuit voltage, short-circuit current, load impedance, required repetition rate and the device’s expected energy absorption. | Use a calibrated current shunt or suitable current transformer with adequate bandwidth. Keep the high-current loop short and rigid, and verify thermal, mechanical and arc-flash controls. |
| Combined voltage-current surge test | Application-specific combination of voltage and current impulses | Voltage and current simultaneously or sequentially | Complete surge protection assemblies, coordinated protection systems and equipment exposed to both insulation stress and conducted surge current | The voltage and current waveforms are influenced by the generator, source impedance, test object and connection layout. They should be verified at the test terminals. | Consider a dedicated combination-wave system or coordinated voltage and current sources. Confirm peak voltage, peak current, source impedance, coupling method and energy delivered to the test object. | Synchronize measurement channels and confirm insulation, grounding and trigger performance before applying full energy. Record both applied and residual waveforms where applicable. |
| Generator output capability | Not defined by waveform alone | Peak value, energy and repetition capability | Any impulse test where the nominal waveform is correct but the generator may not deliver the required stress to the actual load | The connected test object can change rise time, decay time, peak value and oscillation. Generator ratings should therefore be checked with the intended load, not only under open-circuit conditions. | Compare peak voltage or current, stored energy, effective source impedance, capacitance or inductance range, charging time, trigger stability and maximum permissible repetition rate. | Check the complete measurement chain, including sensors, dividers, cables, bandwidth, grounding and calibration uncertainty. Use acceptance limits defined by the applicable test standard. |
| Waveform verification | 1.2/50 μs or 8/20 μs nominal shape | Time-domain conformity | Routine validation, type testing, laboratory commissioning and troubleshooting of impulse test systems | Confirm front time, time to half-value, peak value, polarity, overshoot, oscillation and reproducibility. The permissible tolerances depend on the applicable standard and test configuration. | Choose a generator with practical adjustment of resistors, inductors, capacitors or equivalent control elements so the required waveform can be obtained at the test object. | Measure at the defined reference point using traceable instruments. Document the test circuit, load condition, waveform parameters, environmental conditions and any deviations. |
| Decision rule for 2026 selection | Define the objective before selecting the generator | Match source type to stress type | Prevent purchasing a voltage impulse generator for a current impulse requirement, or a current source for an insulation withstand requirement | A 1.2/50 μs test is principally a voltage insulation test; an 8/20 μs test is principally a current surge test. Their generators, sensors, connection layouts and safety controls are different. | First specify the waveform and test object. Then calculate the required peak value, load range, energy, repetition rate, measurement bandwidth and future expansion needs. | Require documented calibration, interlocked operation, emergency discharge, remote control where appropriate, guarded test areas and procedures consistent with the laboratory’s electrical safety program. |