| Product and application fit | 12% | Product drawings, rated voltage and current, pole configuration, dimensions, mounting details, and intended use. | Check that the offered design matches the application and applicable electrical system; resolve drawing and specification differences before sampling. |
| Standards and market compliance | 15% | Applicable test reports, certificates, model lists, and the name and address of the certificate holder or testing body. | Verify that documents cover the exact product and destination market. IEC 60884-1 covers household plugs and socket-outlets within its scope; other connector products may fall under different standards. Confirm current requirements with the relevant market authority or testing body. |
| Quality management | 10% | Quality-management certificate, scope, site address, validity, and documented inspection procedures. | Check certificate status with its issuer or accreditation database where available. ISO 9001 relates to quality-management systems; it is not product certification. |
| Materials and component control | 10% | Material specifications, supplier declarations, incoming-inspection records, and traceability for conductive and insulating parts. | Compare declared materials with the approved sample and product requirements. Request applicable restricted-substance documentation for the destination market. |
| Testing and inspection | 12% | Routine and type-test procedures, equipment calibration records, inspection plans, and sample test results. | Confirm tests are relevant to the product and specification. For higher-risk orders, arrange independent pre-shipment inspection or testing by a qualified laboratory. |
| Production capability and capacity | 8% | Relevant production processes, equipment list, production-flow overview, and capacity available for the requested order. | Check whether key processes are performed in-house or subcontracted, and whether capacity claims can be supported by production records or a site audit. |
| Sample and specification consistency | 8% | Pre-production sample, approved drawings, bill of materials, and written change-control procedure. | Approve and retain a reference sample. Require written approval for changes to materials, design, manufacturing site, or critical components. |
| Lead time and delivery performance | 7% | Written lead time for samples and production, production schedule, packaging details, and recent on-time delivery records. | Compare quoted lead times with your schedule and verify performance using order records or references. Treat lead time as supplier- and order-specific. |
| MOQ, pricing, and payment terms | 6% | Itemized quotation, minimum order quantity (MOQ), tooling or setup charges, packaging costs, and payment terms. | Compare like-for-like specifications and clarify quote validity, currency, Incoterms, and any extra charges. Do not assume a low unit price includes compliance testing or tooling. |
| Customization and engineering support | 5% | Engineering contact, drawing-review process, tooling ownership terms, and process for validating custom designs. | Assess response quality and technical clarity. Confirm intellectual-property, tooling, and design-change terms in writing. |
| Traceability and corrective action | 4% | Batch or lot identification, production records, complaint-handling process, and corrective-action reports. | Check whether a production lot can be traced to its materials and inspection records, and whether problems receive documented root-cause analysis. |
| Communication and after-sales support | 3% | Named project contact, response process, warranty terms, and procedure for handling defects or returns. | Evaluate responsiveness and whether commitments are recorded clearly in the quotation, purchase order, or supply agreement. |
| Total evaluation weight | 100% | Score each dimension consistently, for example from 1 (insufficient evidence) to 5 (strong, verified evidence), then apply the weights to compare shortlisted suppliers. |